Power Plant

The captive power plant was planned to utilize the sensible heat contained in the kiln waste gas of the sponge Iron Plants. It is estimated that from the quantity of energy available in the waste gas of the kilns about 42 T per hour of steam could be generated in the first power plant and 50 T per hour of steam can be generated from the second power plant. Hence,the Turbo Generator selection for the first power plant was done at 12 MW and 24 MW for the second power plant. The plant comprises of the following major units:

  • Waste Heat Recovery Boilers (WHRB) 2 nos
  • Atmospheric Fluidised Bed Combustion Boilers (AFBC) 2 nos
  • Turbo Generator Units (TG) 2 nos